A 17,000-ton press machine is forging an alloy steel ingot into a component for a steam generator of the Shin-Hanul nuclear reactor unit 3 and 4. [DOOSAN ENERBILITY]
Doosan Enerbility employees work on the final assembly of a large-scale gas turbine. [DOOSAN ENERBILITY] Cnc Machining Components
Korea, Ecuador seek stronger economic ties through free trade deal
Media regulator pushes ahead with TV license fee bill despite KBS opposition
Air Premia targets flying into profit by 2024
Korean, Chinese consumers show hostility as tensions rise
Doosan Enerbility signs $640 million Saudi desalination deal
Doosan Enerbility bags supply deal for LNG plant project in Uzbekistan
Nuclear stocks soar on hopes of Korean power plant project in Poland
Doosan Enerbility to build cogeneration plant in Saudi Arabia
Doosan Enerbility lands 1.6-trillion-won deal from KHNP for nuclear power project in Egypt
To write comments, please log in to one of the accounts.
Equipment Components All materials contained on this site are protected by Korean copyright law and may not be reproduced, distributed, transmitted, displayed, published or broadcast without the prior consent of Joins.com | Tel: 1577-0510